What is an Engineering Change Order (ECO)?
This article defines engineering change orders (ECOs) and describes the role they play in new product development (NPD) and manufacturing.
Engineering change order (ECO) definition
An engineering change order (ECO) is a document that specifies either new product design details or proposed changes to existing products. ECOs provide a list of all the components, assemblies, and other documents that are affected. The engineering change order is sent to all key stakeholders (change control board or “CCB”) including engineering, quality, procurement, manufacturing, and external design teams or supply chain partners in many cases. Every CCB member is responsible to determine the impact of the change order and whether the ECO can. be implemented as planned and on time. CCB members will approve or reject the change and when all CCB members have approved the ECO, then it can be acted upon.
The role of ECOs in engineering change management
The change process starts when someone identifies an issue that may need to be addressed with a change to the product. It ends when the agreed-upon change is implemented. ECOs are used in between to summarize the modifications, finalize the details, and obtain all necessary approvals.
Key Stages of the engineering change process:
-
Issue identification & scoping:
Someone identifies a problem or issue and determines that it may require a change. The scope of the issue and its possible impact are estimated.
-
ECR creation:
An engineering change request (ECR) is created to examine the necessity and feasibility of the change, to identify parts, components, and documentation that might be affected, to estimate costs, and to list the resources required to implement the change.
-
ECR review:
The ECR is circulated for review and discussion among key stakeholders and is modified as needed.
-
ECO creation:
Once the ECR is approved, an engineering change order (ECO) is generated, which lists the items, assemblies, and documentation being changed and includes any updated drawings, CAD files, material disposition codes, standard operating procedures (SOPs) or manufacturing work instructions (MWIs) required to make a decision about the change.
-
ECO review:
The ECO is then routed to a change control board (CCB) made up of all stakeholders (including external partners when appropriate) who need to approve the change.
-
Approval Notification:
Once the ECO has been approved, the affected individuals are notified that the engineering change should be implemented.
-
Change implementation:
Those responsible for implementation use the information in the ECO to make the requested change. While an engineering change order is used for many changes, some companies will use other types of changes as well. These include manufacturing change orders (MCOs) and document change orders (DCOs).
ECO benefits
While you may groan at the prospect of pulling together another set of documentation, an ECO is a critical part of keeping product development on track and making sure product information is accurate. A good ECO contains the full description, analysis, cost, and impact of a change, and a good ECO process ensures that all stakeholders have bought into the change. Having an organized method of handling product changes reduces potential design, manufacturing, and inventory errors, minimizes development delays and makes it easy to get input from different departments, key suppliers, and contract manufacturers.
Following good ECO practices also makes it easy to document a full history of what changes have been made to a product and when they occurred. In industries with regulatory requirements, like the medical device industry, having a full history of every change to a product is mandatory. (Depending on the industry, change orders and even the change process itself may be audited by a regulatory body.) Keeping a record of product changes will also help you debug any problems that occur after your product launches. The task of identifying and fixing the root cause of any problem is easier when you have a complete product change history.
Without a clear ECO process in place, making a change to a product can set off a chain of costly, time-consuming, and avoidable events. Take a part switch that happens late in the development process. Engineering may tell manufacturing to be aware of the new part, but if that information is never conveyed to the purchasing department, the old part will be ordered. When the components arrive, manufacturing will not be able to assemble the product, and its launch will be delayed until the new part is obtained (most likely with some rush charges incurred along the way).
Engineering change orders make it possible to accurately identify, address, and implement product changes while keeping all key stakeholders in the loop and maintaining a historical record of your product. Without them, miscommunications occur that lead to delays, incorrect purchase orders, and improper product builds.
Engineering Change Orders: Paper-based vs. electronic software systems
With Paper/Manila Folders |
With Electronic Systems |
|
---|---|---|
Cycle Time |
|
|
Signature Process |
|
|
Issue Resolution |
|
|
Package Format |
|
|
Conclusion
Companies need to be able to adapt quickly in today’s constantly changing environment, and often that means making changes to their products. Engineers make modifications during development and production with the intent of adding functionality, improving manufacturing performance or addressing the availability of a particular part.
To make sure proposed changes are appropriately reviewed, a solid process is critical—especially if members of your product team are scattered across multiple locations (for instance, design engineers in Boston, the manufacturing team in Texas, and component manufacturers all over the world). At the heart of a solid engineering change management process is the engineering change order. Read about five fixes that can help improve engineering change management.
Learn how Arena PLM can help you control your engineering change process, accelerate your engineering change order review and approval processes, and eliminate ambiguity when communicating product changes to your extended supply chain. Also check out our free ECO template.
Echo Arena — Home — VR Master League
Season has terminated.
Keep an eye out for the next season announcement!
VRML Off-Season Updates
by
Blank56
|
Thu, Dec 08
We are now into the Echo Arena off season and have already seen some major roster changes and teams form. Pre-season and season 1, 2, and 3 champions jokr is now back together, Season 6 champions the neighbors are now down to two players, and the return of a fan favorite wirless jacks is on the horizon. The VRML Moderation team has posted an announcement updating the rules changing some and adding more clearity as well. Stay tuned because if this has all happened in just a few weeks of the off season I’m excited to see whats next! If you are interested in Echo Arena VRML make sure to join us here
CONGRATS TO OUR SEASON 6 CHAMPIONS and.. More Exciting News!
by
Leeloo
|
Thu, Dec 08
A huge congratulations to the CHAMPIONS of Season 6! We had some wonderful and exciting matches. HUGE shout out to our fantastic creator team for the assets, interviews, and other artwork made for finals. Shout out to our fantastic casters for the lovely show they put on. Andddd shout out to our mod team for running everything in the background and making this happen. We could not do it without you all or without our community there watching and supporting. So, thank you to everyone! It was a great one… Hope to see you all in Season 7!
OCE TOP 3
1st EXO Clan
2nd Villain
3rd Euphoria
EU TOP 3
1st Blast!
2nd Scuffed
3rd Team Gravity
NA TOP 3
1st The Neighbors
2nd Vicious
3rd Instinct
ECHO ARENA VRML SEASON 7 2023!
Season 7 will start January 23, 2023.
Everyone has been asking for when Season 7 will start and here it is! The calendar is live and the Season is planned! We are very excited for next season because we have something very special happening. ..
SEASON 7 NA GRAND FINALS WILL BE HOSTED LIVE IN DENVER, COLORADO JUNE 3-4, 2023!
Wanting to attend the LAN?! Tickets are LIVE right now! http://vrml.gg/LANTickets
Tickets are 55$ through January!
We are very thankful to our sponsors, and especially to VR Arcade USA. VR Arcade USA has joined VRML to be partners in hosting our VRML LAN next year. This LAN will be hosted at Colorado Convention Center. 2 finalist teams NA for Season 7 will be flown out and lodged by VRML. So much more than just prizing next season! The centerpiece of the event will be the Grand Finals, but there will be plenty of other things to look forward to. More details to come…
SEASON 6 FINALS — THE DETAILS YOU NEED TO KNOW!
by
Leeloo
|
Fri, Nov 18
Last weekend, our finalists rose to the occasion and played their best to qualify for the Grand Finals! With $11,220 in cash and gear from our sponsors, HyperX, VR Cover, and Asterion Products, there’s a lot on the line.
In OCE, the Japanese finalists, Villain, and the reigning champions, EXO Clan (formerly known as Leviathan), will be playing for the title of Season 6 OCE/Asia Champions! Having met 9 times in the last 2 seasons, Villain have only gotten one win off of EXO Clan, but they are determined to be this season’s champions. Their progression and growth has been astounding. However, EXO Clan will not give up the crown without a fight. They are experienced and they are ready. Get to know the OCE/Asia finalists with these interviews:
Sunday, November 20th at 3 PM AEDT | 11 PM EST (Saturday), you can catch the Season 6 OCE/Asia Grand Finals on https://twitch.tv/echoarena_vrml
Bracket: https://challonge.com/EchoArenaS6FinalsOCE
In EU, the battle was hard fought and Blast! and Scuffed came out on top! Sunday, they’ll meet again to play for that coveted title of Season 6 EU Champions. Both teams came very close in previous seasons. In Season 5, Blast! came second and Scuffed, fourth. Scuffed is the underdog with only one win against Blast! in two seasons. It’ll be a great match and we wish good luck to all the players! Watch their interview here:
Tune into the Season 6 EU Grand Finals on all our platforms Saturday, November 20th at 11 AM PDT | 2 PM EDT | 1900 UTC :
Meta Horizon Worlds https://ocul.us/3hXcB8E
Twitch https://twitch.tv/vrmasterleague
Bracket: https://challonge.com/EchoArenaS6FinalsEU
In NA, the competition is fierce with many matches still to be played to determine our Grand Finalists. juice box, Hot Drop, The Neighbors, Ethereal, Vicious, and Instinct are still in the running. Saturday November 19th, the competition continues! Watch their interviews here:
Tune in here:
Saturday, November 19th — Semi-Finals starting at 1 PM PST | 4 PM EDT | 2100 UTC
Meta Horizon Worlds: https://ocul. us/3OedtSJ
Twitch: https://twitch.tv/vrmasterleague
Sunday, November 20th — Lower Bracket Finals starting at 2 PM PST | 5 PM EDT | 2200 UTC
Meta Horizon Worlds: https://ocul.us/3Gr4w6t
Twitch: https://twitch.tv/vrmasterleague
Sunday, November 20th — Grand Finals starting at 3:30 PM PST | 6:30 PM EDT | 2330 UTC
Meta Horizon Worlds: https://ocul.us/3Gr4w6t
Twitch: https://twitch.tv/vrmasterleague
Bracket: https://challonge.com/EchoArenaS6FinalsNA
And, we’ll be doing MASSIVE GIVEAWAYS during the matches and on our social media accounts! Here is the link to our social media giveaway: https://vrmasterleague.com/FallFest2022
Good luck to all our finalists and community members!
Echo Arena Season 6 Championship HYPE
by
Leeloo
|
Fri, Nov 11
After 12 weeks of regular play, we are almost ready to present the Season 6’s finalists for all three regions! They’ll be playing to reach the Grand Finals on November 20th and for a prize pool of $11,220 in cash and gear from our sponsors! Congrats to all who made it so far!
Details: https://vrmasterleague. com/EchoArena/Championships/Season6
OCE/Asia Finalists: EXO Clan, Villain, Astrea, Euphoria, F3verDream, and Last Centurions
Bracket: https://challonge.com/EchoArenaS6FinalsOCE
EU Finalists: Blast!, Scuffed, Fire Entrance, Astronomic, Fireballs, Team Gravity, NothingToLose, and Koi
Bracket: https://challonge.com/EchoArenaS6FinalsEU
NA Finalists: juice box, Vicious, Instinct, Ethereal, W, Kangorillaz, Anomaly, Hot Drop, The Neighbors, and Montage
Bracket: https://challonge.com/EchoArenaS6FinalsNA
Where to watch Day 1, November 12th?
OCE/Asia Semi-Finals — Day 1, 3 PM AEDT | 11 PM EST
EAML1: https://twitch.tv/echoarena_vrml
EAML2: https://twitch.tv/echoarena_vrml2
EU Semi-Finals — Day 1, 12:30 PM EST | 1730 UTC
Meta Horizon Worlds: https://ocul.us/3DYdnKe
Twitch: https://twitch.tv/vrmasterleague
YouTube: https://youtu.be/jTVtJH6tlZw
Facebook: https://fb.me/e/3ILOxlQ1d
NA Semi-Finals — Day 1, 2:30 PM PST | 5:30 PM EST
Meta Horizon Worlds: https://ocul. us/3g2YRIZ
Twitch: https://twitch.tv/vrmasterleague
YouTube: https://youtu.be/z8lJNdUSYsA
Facebook: https://fb.me/e/9bySlCAkq
Where to watch Day 2, November 13th?
OCE/Asia Semi-Finals — Day 2, 3 PM AEDT | 11 PM EST
EAML1: https://twitch.tv/echoarena_vrml
EAML2: https://twitch.tv/echoarena_vrml2
EU Semi-Finals — Day 2, 12:30 PM EST | 1730 UTC
Meta Horizon Worlds: https://ocul.us/3G7iASn
Twitch: https://twitch.tv/vrmasterleague
YouTube: https://youtu.be/8pFcypfW7wA
Facebook: https://fb.me/e/3246sZIXt
NA Semi-Finals — Day 2, 2:30 PM PST | 5:30 PM EST
Meta Horizon Worlds: https://ocul.us/3Tum30D
Twitch: https://twitch.tv/vrmasterleague
YouTube: https://youtu.be/G3sEi1g1G-g
Facebook: https://fb.me/e/4YESmJM9b
Who will advance? Who’s season will end this weekend? Tune in to find out!
Interview with iFoxy: Captain of Everkey.com
by
esxx_
|
Thu, Sep 01
Okay! Hello and thank you for taking some time to answer my questions today! Would you like to start by introducing yourself to our readers?
«I am iFoxy and I am the current captain of Everkey. «
Okay. First off: Congrats on getting into Master Tier! Incredibly well played in the Challenger Cup. What do you think made you guys stand out from the other teams in the end?
«Honestly, I don’t know. At the end of the day.. I guess we just played a bit better than the others. We played many very, very good teams and anyday this could have went anywhere you know? I think in the end we just made less mistakes than the others and just had a good day. Seem maybe other players had an off-day but we just had a great day and great plays. I hope we will be able to keep playing like that.»
Interesting, amazing performance you had that day indeed! Well, onto the next question: You being the captain, how much influence do you think you had over the performance of your teammates?
«I mean, we kinda all share a thing and that kinda stuff, like: I’m listed as captain but we really don’t have a hierachy and everybody just does their job and do what they should be doing. So we’re not like: Oh you’re captain you should be managing everything and it’s more or less like: We’re all working together to make what is best for the team.
Yes, I think that is something very important for the sake of the team. Next up: What did it feel like when you guys knew you’re going to play in Master? Surely the hype must have been real!
«Uhm well, it was very loud! I think also because only three of our players have been in Master before. Now we also got Ninjatim- and Unknown- on the team as well. But yeah, it was very hyped up — very loud and I think we were all very happy when we won.
Absolutely, I can only imagine! Do you think you’ll be able to stay in this Master Division for longer? What are your goals for the next few cycles anyway?
Our goal is going to stay in Master Tier — even reach the Top 5 of Master in the future. That’s going to need a lot of practise though, especially because TechnoWubs doesn’t have much time at the moment — having to drop down to sub which really got rid of some chemistry. And since no one has chemistry with the new guys yet, it’s going to take a bit of time but we are certains that we’ll get good together soon.
Yeah, will definitely require a lot of practising and scrimming, I’d imagine. But well, Ending it up here: what is your advice for all the new teams and players out there? What do you think is the most important part of this game to get good and climb the ladder?
Well, whenever you’re playing with your team you have to utilise everbody in the arena. There are a lot of good players that are good on their own and anyday they could be considered a «Master Player» but the problem is: many people don’t want to utilise their teams and that’s where the chemistry comes in — so it’s a bit of both: You have to want it, be willing to train while also having teammates that are on the same page — that wanna get better and be in that spot.
That sounds like very good advice, especially for new teams coming into the League! Well thank you very much for answering and I wish you the best for this season!
«It has been my pleasure!»
North American Cycle 1 Challenger Cup!
by
Leeloo
|
Sat, Aug 27
Hello Folks!
It’s almost time for the NA Cycle 1 Challenger Cup! This cup decides, after 4 weeks of regular play, who will enter the Cycle 2 Master tier and who will be relegated to the ladder.
The 8 teams entering the Cup are: Young Money Clan, 7 (Seven), Odyssey, EverykeyNet, Cerberus, Zen, 10.2.1, and Hex! You can see what players are predicting for this exciting event here on Challonge: https://challonge.com/EchoArenaVRMLS6C1CCNA/predictions
Links to watch:
Challenger Cup Day 1 Stream Links:
Horizon Worlds: http://ocul.us/3Km5gtu
Twitch: https://twitch.tv/vrmasterleague
YouTube: https://youtu.be/HHe2hKpe__c
Facebook Gaming: https://fb.com/events/367941775375419
Challenger Cup Day 2 Stream Links:
Horizon Worlds: http://ocul.us/3Czpga9
Twitch: https://twitch.tv/vrmasterleague
YouTube: https://youtu.be/D35TyQk9aD0
Facebook Gaming: https://fb.com/events/1238081600326977
And, stay tuned for a giveaway featuring a gift from our sponsor, HyperX!
Good luck to all!
Week 4 EU Worlds (aka Venues) Showcase Pre-Game Analysis
by
Leeloo
|
Sat, Aug 20
Analysis by _esxx
in an hour Fireballs vs. Legionaries:
After having to play the start of the season with League Substitutes, Fireballs got ranked in Gold tier after playing in Diamond and Master tier in previous seasons. They will now be trying to fight themselves up the ranks once again with Legionaries being the first hurdle in their way. Staying 3-0 in their first matches as a team, they are a force to be reckon with.
in 2 hours BlueFire vs. droid
Team droid, a team currently ranked in Gold tier, though finishing in high Platinum last season, is going against BlueFire, a new team with veteran players with Seasons of experience in the Platinum and Diamond ranks. With BlueFire standing 5-2 and droid 4-2 in terms of wins and losses, they’ve already shown that they are definitely worthy of their ranks — maybe even enough to strike for more!
in 2 hours Lite vs Skull Breakers
Lite, a returning team from last season, though sitting out the first few weeks, have already shown in their first game what they are capable of doing. Skull Breakers, a team also formed last season, are currently standing 3-3 in terms of a Win-Loss ratio and are now looking to break out of the Bronze into the embattled Silver tier!
Watch it all unfold right here:
Worlds: https://ocul.us/3QVi38q
Twitch: https://twitch.tv/vrmasterleague
YouTube: https://youtu.be/C5pCBQvO2hs
Facebook Gaming: https://fb.com/events/463928225599690
Season 6 starts off strong
by
Blank56
|
Tue, Aug 09
With the beginning of season 6 under way we have already seen some of the top teams disband and the players forming new teams which means this season the throne is really up for the taking and this season there is no clear winner. In NA most teams have reformed or disbanded, In EU the master tier will really be a fight and up for grabs now without a master bracket, and in OCE for the first time since season 2 Leviathan has lost their master star I wonder if they will reclaim it or maybe we will see another challenger step in to steal it away. With a 30% increase in teams in the first two weeks of the season alone we will see a lot of new faces and new potential being brought into VRML. If you plan on participating make sure to to join the Echo Arena VRML discord server https://discord.gg/VRML and hopefully we will see you in the arena!
The Countdown Has Begun!
by
Leeloo
|
Mon, Jul 11
2 weeks until the Season 6 Master Qualifier and Start Date!
On July 23-24 we will be hosting the EU and NA Master Tier Qualifiers. The format from last season will be largely unchanged. However, the presentation of this format will be undergoing some alterations.
Each Region’s Qualifer will be on a single day.
Saturday, July 23 — EU @6pm BST Sunday, July 24 — NA @6pm EDT
Team Registration
Teams that believe they are eligible for a spot in the Master Tier Qualifier for either NA or EU will have until Monday, July 11 to have registered their full roster on the website. At that time the Moderation team will begin the process of filling those 16 spots for each region.
Master Quali Schedule
EU and NA schedules are slightly different due to the stream event taking place in NA.
EU: Times BST Round 1: 6:00p | Round 2: 6:45p Round 3: 7:30p | Round 4: 8:15p Round 5: 9:00p
NA: Times EDT Round 1: 6:00p | Round 2: 7:00p Round 3: 8:00p | Round 4: 8:45p Round 5: 9:30p
Master Tier Qualifier Format
This modified-swiss tournament is designed to start with 16 teams and declare 8 winners. Teams compete until they have either Won 3 games or Lost 3 games, whichever happens first.
In EU, these 8 winners will make up the EU Master Tier.
In NA, the #1 and #2 teams from the previous season auto-qualify and combine with the 8 Master Quali Winners to make the 10-Team NA Master Tier.
In line with ongoing efforts to continue driving up the value and quality of our tournaments: VRML is looking to partner with outside Organizations and Casters in an attempt to cast all 34 games over 5 rounds in the Master Tier Qualifier in North America. VRML recognizes the value of the growing Echo Arena ecosystem and we would like to invite you all to participate in a celebration of the continued growth of both our beloved meta-sport and the community that surrounds it. We have opened registration for any organizations, casters, streamers, and other interested parties that would like to participate in this event. Fill out the form!
Regular season starts July 25th! Get in Discord for full details discord.gg/SBb628eJuQ
See you there!
Congrats to our Season 5 Champions!
by
Leeloo
|
Mon, May 30
Season 5 Finals are over…
Another huge congratulations to our Champions:
NA: Ignite
EU: Vertigo
OCE: Leviathan
If you happen to have missed the finals this past weekend and want to watch them, go check out our Youtube!
https://www. youtube.com/c/EchoArenaMasterLeague/videos
We had a fantastic weekend with so much fun. Thank you to the teams, viewers, & all of the VRML staff that made this happen. Specifically to the casters who made the streams fun to watch & the creators who did so AMAZING this season.
Applications: https://vrmasterleague.com/Volunteers
Season 6 will begin on July 25th??, but we have a lot to do until then!
Some things you can look forward to:
— Season 5 Feedback Forms
— More information about badges
— Season 6 discussions
We need everyone’s help when planning another season so make sure to help us out!
Thanks to Ready At Dawn! We wouldn’t be here without your continued support & the exciting game that you’ve created!
Thanks to our sponsors! VR Cover, Kiwi Design, HyperX, Asterion Products, and ARMAgg. This season’s prize pool is the biggest at a total of $15,020 USD ($3,400 in Elite Cup prizing and $11,620 in cash and prizes for the championship)!
See you in the arena in Season 6!
Luxury hotels near Liverpool Eco Arena in Liverpool from 1354 RUB
1-20 of 70
proximity
- Price: start cheap
- Price: start with expensive
- Rating: start high
- Popularity: Popular first
- Location: first close
Filters applied
Liverpool Eco Arena
×
Luxury hotels
×
View on map 1. 8 km from city center Liverpool Eco Arena 200 m from hotel
Located in the city centre, close to the bus stop, the hotel has 216 rooms and a lounge restaurant.
Excellent114114 reviews
Price from
RUB 5,063
/nightSelect
N/A
Largest apartment:
6 adults
View on map 1.7 km from City Center 200 m from Liverpool Eco Arena
This 2-bedroom self-catering apartment is located 20 minutes’ walk from Liverpool city centre.
Excellent762762 reviews
Price from
RUB 41 931
/nightSelect
N/A
City Center 1.6 km from the hotelLiverpool Eco Arena 200m from the hotel
This quality and affordable hotel is located very close to Tate Liverpool, a stone’s throw from Goodison Park, and offers 132 rooms for non-smokers. nine0003
Excellent334334 reviews
Price from
RUB 6 989
/nightSelect
N/A
City Center 1.6 km from the hotelLiverpool Eco Arena 200m from the hotel
Built in 2008, this hotel has an excellent location in the historic district and offers comfortable rooms and a private swimming pool.
Excellent14511451 review
Price from
RUB 4,778
/nightSelect
N/A
1.5 km from City Centre400 m from Liverpool Eco Arena
A 20-minute walk from Liverpool city center and close to the Maritime Museum, this hostel offers rooms with street views.
Very good185185 reviews
Price from
RUB 1 355
/nightSelect
N/A
City Center 1.5 km from the hotelLiverpool Eco Arena 400 m from the hotel
This luxurious hotel is located in the Liverpool city center area, close to Liverpool. nine0003
Price from
RUB 35 656
/nightSelect
N/A
City Center 1.4 km from hotelLiverpool Eco Arena 600 m from hotel
The hotel is a couple of minutes’ drive from Anfield Stadium and just 10 minutes’ walk from the Maritime Museum.
Price from
RUB 6 775
/nightSelect
N/A
1.2 km from City Center 700 m from Liverpool Eco Arena
Built in 2009 in Liverpool City Centre, this hotel offers 215 stylish rooms as well as cots, meals and a kids’ mini club.
Excellent800800 reviews
Price from
RUB 7 274
/nightSelect
N/A
4 Adults
2 Bedrooms
2 Beds
2.3 km from City Center 800 m from Liverpool Eco Arena
This hotel is located only 0.9km from the M&S Bank Arena in Liverpool, and will delight guests with a water park, water slides and a sun terrace.
Price from
RUB 20 966
/nightSelect
N/A
City Center 1.0 km from the hotel Liverpool Eco Arena 800 m from the hotel
Adjacent to the hotel is ACC Liverpool Arena and Convention Centre, and just a 10-minute walk from the Cavern Quarter.
Excellent4040 reviews
Price from
RUB 5 420
/nightSelect
N/A
City Center 1.0 km from the hotel Liverpool Eco Arena 800 m from the hotel
This elegant building is within walking distance of the Arena and ACC Liverpool.
Very good55 reviews
Price from
RUB 9 413
/nightSelect
N/A
1.0 km from City Center 800 m from Liverpool Eco-Arena
Located in the heart of Liverpool, this hotel offers 31 rooms with city views.
Excellent109109 reviews
Price from
RUB 5 634
/nightSelect
N/A
9 adults
3 bedrooms
5 beds
2.3 km from city centerLiverpool Eco Arena 800m from hotel
and Liverpool Marina is nearby. nine0003
Very good88 reviews
Price from
RUB 21 393
/nightSelect
N/A
City Center 1.0 km from hotel Liverpool Eco Arena 800 m from hotel
The hotel is a couple of minutes’ drive from Liverpool Metropolitan Cathedral and just a 13-minute walk from the Liverpool Museum.
Very good336336 reviews
Price from
RUB 6 489
/nightSelect
N/A
1.0 km from City Center 900 m from Liverpool Eco Arena
The hotel is located next to the Cosmodrome and just a 5-minute walk from Liverpool ONE Shopping Centre.
Excellent77 reviews
Price from
RUB 37 296
/nightSelect
N/A
City Center 1.0 km from the hotel Liverpool Eco Arena 900 m from the hotel
Located in the Liverpool City Center area, next to the train station, this hotel offers 17 designer rooms with garden views. nine0003
Excellent5454 reviews
Price from
RUB 10 340
/nightSelect
N/A
City Center 1.0 km from hotel Liverpool Eco Arena 900 m from hotel
Conveniently located close to the train station, this budget hostel offers quick access to Liverpool Shopping Park and nearby bars and restaurants.
Excellent11 reviews
Price from
RUB 2,139
/nightSelect
N/A
City Center 1000m from hotelLiverpool Eco Arena 900m from hotel
This hotel with a private pool is located close to the beach and close to Liverpool.
Excellent12761276 reviews
Price from
RUB 4 421
/nightSelect
N/A
Largest apartment:
5 adults
3 bedrooms
4 beds
City center 1000 m from hotelLiverpool Eco Arena at 900 m from the hotel
Boasting a terrace and stunning views, this apartment is conveniently located near the train station and attractions such as Concert Square and Concert Square.
Ideal729729 reviews
Price from
RUB 6,917
/nightSelect
N/A
City Center 1.2 km from hotel Liverpool Eco Arena 900 m from hotel
This high-end design hotel in Liverpool features an indoor pool and a library. nine0003
On April 23, volunteers cleaned up the area around the Samara Arena stadium. More than 250 representatives of 13 companies and organizations — members of the regional office of the National Council for Corporate Volunteering (NCVC) took part in the clean-up.
The action was also supported by representatives of the Polytechnic University. A group of first-year students of the Faculty of Civil Engineering and Technology actively involved in garbage collection. And the members of the student council acted as volunteer curators organizing the work of groups in different areas. The Head of the Practice Sector of the Office for Work with Industrial Partners became the coordinator of the students of the flagship university Evgenia Kharitonova .
Subbotnik was held in the format of an ecological game. For each collected bag with a certain type of waste, the participants received points. Plastic, which decomposes in nature for hundreds of years, was rated the highest. Such waste will be sent for recycling for recycling.
The student team of the Polytechnic University took second place in the competition, losing only to the team of the regional public organization «Environmental Control of the Samara Region». The winners excelled in collecting oversized garbage, removing not only 15 bags of plastic from their site, but also fragments of the barrier, road signs and other remains of last year’s construction site. Third place went to Philip Morris International in Russia.
nine0003
In total, corporate volunteers collected 350 bags of garbage, as well as oversized garbage with a total weight of more than 3.5 tons.
After the community work day, the volunteers were able to refresh themselves with porridge from the field kitchen and visit the Samara Arena stadium with a tour. And on the training field there was a master class from the football club «Wings of the Soviets».
– The start was successful: we helped prepare the area around the main stadium in Samara for the new football season. And most importantly, the participants of the action, employees of different companies felt how great it is to do good deeds together. I am sure that their energy will allow us to carry out many new actions, and the example will be contagious — and the number of volunteers in the Samara region will grow with each project, — summed up Anna Bushlyakova , Chairman of the NSCR Regional Office, Regional Corporate Affairs Manager for Philip Morris International in Russia.
Note that the Polytechnic University became a member of the National Council for Corporate Volunteering at the end of 2018. Currently, more than 30 largest companies in Russia are members of the council, including Rusal, Norilsk Nickel, Gazprom Neft, Nestle, Russian Machines, LG and others.